In short: Regulation (EU) 2023/1115 (EUDR) does not accept verbal “deforestation-free” assurances — the EU importer must file a due diligence statement on the EU Information System with the geolocation of every production plot (polygons for plots over 4 ha), and the EU cross-checks with satellite data (Copernicus). For Vietnamese exporters of coffee, rubber, wood, cashews and more to the EU, “digital traceability” is no longer a marketing plus but the condition for clearing EU customs from 30 December 2025 (medium/large firms) and 30 June 2026 (micro/small). This article maps the data chain — from plot to container.
What data EUDR demands, and at what granularity
Three mandatory data groups. One, geolocation: every raw-material plot needs coordinates (longitude, latitude); plots over 4 ha need surrounding polygons. Two, “deforestation-free” evidence: no deforestation on the plot after 31 December 2020 — the EU verifies by satellite imagery, so coordinates off by a few hundred metres can flag a consignment as risky. Three, “legality” evidence: documents proving production complied with Vietnamese law (land-use rights, harvesting permits…). Vietnam is low-risk (Regulation (EU) 2025/1093) — importers get simplified procedures — but coordinates and legality evidence remain mandatory.
Building the data chain: four layers
Layer 1 — plot mapping: measure and collect coordinates for every sourcing plot (smallholders, plantations, planted forests). With thousands of smallholders in the chain, this is the costliest layer — the practical route runs through cooperatives: training, GPS-phone measurement support, format standardisation. Layer 2 — digitised legal files: land-use rights, permits, purchase contracts — centrally stored, each lot traceable to its plots. Layer 3 — lot traceability: lot codes linked from plot through processing and warehousing to the export container; the “one step up, one step down” principle — each link records its inputs and outputs. Layer 4 — internal satellite cross-check: before handing data to the importer, self-check coordinates on satellite maps to catch errors early.
Who pays — and how to negotiate it
Measurement, digitisation and system upkeep are in principle the supplier’s cost, but negotiable in practice: EU importers who urgently need data for their own declarations often provide technical support or share costs — especially with strategic long-term suppliers. Put “traceability-system support” into framework-contract talks: the buyer funds initial measurement, the seller commits to maintaining data and accepting audits. Do not wait for the importer’s supplier questionnaire — by then a harvest season is lost.
Where to start in the next 90 days
Weeks 1–2: list all sourcing regions and collection points. Weeks 3–6: pilot coordinate measurement with 2–3 cooperatives and standardise file templates. Weeks 7–10: digitise legal files and design lot traceability codes. Weeks 11–12: run one “fully traceable” pilot lot from plot to container, satellite cross-check, learn lessons, then scale. Goal: before 30 December 2025, 100% of EU-bound lots carry a complete traceability dataset.
Frequently Asked Questions
- What granularity of coordinates does EUDR require?
- Geolocation for every production plot; surrounding polygons for plots over 4 ha. The EU cross-checks with satellite data, so coordinates must be accurate.
- What about smallholders without coordinates?
- Businesses must help smallholders measure (a GPS phone suffices for point coordinates), best done through cooperatives for standardisation. The costliest but mandatory layer.
- Vietnam is low-risk — are coordinates waived?
- No. Low-risk status (Reg (EU) 2025/1093) only simplifies the due-diligence procedure; coordinates and legality evidence remain mandatory in the statement.
- When must Vietnamese goods carry full traceability data?
- EUDR applies from 30 December 2025 for medium/large firms and 30 June 2026 for micro/small firms (counted on the EU importer side). Complete the system before these dates.
Related articles
- Environmental Registration for Small-Scale Livestock Farms in Vietnam: Dossier, Commune-Level Filing and Deadlines
- Livestock Farm Waste Treatment in Vietnam: Obligations, Discharge Standards and Environmental Monitoring
- Banned Substances in Livestock Farming and Animal Feed in Vietnam: Legal Framework, Decree 211/2026 Penalties, and How to Check the Official List
- Environmental Permits for Livestock Farms in Vietnam: Who Needs One, Dossier and Deadlines
- Administrative Penalties in Livestock Farming under Decree 211/2026/ND-CP
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.

