Data, Technology and Compliance

Digital Traceability for EUDR: How Vietnamese Businesses Build the Data Chain

Detailed aerial view of lush green rainforest canopy in Malaysia, showcasing vibrant nature.

In short: Regulation (EU) 2023/1115 (EUDR) does not accept verbal “deforestation-free” assurances — the EU importer must file a due diligence statement on the EU Information System with the geolocation of every production plot (polygons for plots over 4 ha), and the EU cross-checks with satellite data (Copernicus). For Vietnamese exporters of coffee, rubber, wood, cashews and more to the EU, “digital traceability” is no longer a marketing plus but the condition for clearing EU customs from 30 December 2025 (medium/large firms) and 30 June 2026 (micro/small). This article maps the data chain — from plot to container.

What data EUDR demands, and at what granularity

Three mandatory data groups. One, geolocation: every raw-material plot needs coordinates (longitude, latitude); plots over 4 ha need surrounding polygons. Two, “deforestation-free” evidence: no deforestation on the plot after 31 December 2020 — the EU verifies by satellite imagery, so coordinates off by a few hundred metres can flag a consignment as risky. Three, “legality” evidence: documents proving production complied with Vietnamese law (land-use rights, harvesting permits…). Vietnam is low-risk (Regulation (EU) 2025/1093) — importers get simplified procedures — but coordinates and legality evidence remain mandatory.

Building the data chain: four layers

Layer 1 — plot mapping: measure and collect coordinates for every sourcing plot (smallholders, plantations, planted forests). With thousands of smallholders in the chain, this is the costliest layer — the practical route runs through cooperatives: training, GPS-phone measurement support, format standardisation. Layer 2 — digitised legal files: land-use rights, permits, purchase contracts — centrally stored, each lot traceable to its plots. Layer 3 — lot traceability: lot codes linked from plot through processing and warehousing to the export container; the “one step up, one step down” principle — each link records its inputs and outputs. Layer 4 — internal satellite cross-check: before handing data to the importer, self-check coordinates on satellite maps to catch errors early.

Who pays — and how to negotiate it

Measurement, digitisation and system upkeep are in principle the supplier’s cost, but negotiable in practice: EU importers who urgently need data for their own declarations often provide technical support or share costs — especially with strategic long-term suppliers. Put “traceability-system support” into framework-contract talks: the buyer funds initial measurement, the seller commits to maintaining data and accepting audits. Do not wait for the importer’s supplier questionnaire — by then a harvest season is lost.

Where to start in the next 90 days

Weeks 1–2: list all sourcing regions and collection points. Weeks 3–6: pilot coordinate measurement with 2–3 cooperatives and standardise file templates. Weeks 7–10: digitise legal files and design lot traceability codes. Weeks 11–12: run one “fully traceable” pilot lot from plot to container, satellite cross-check, learn lessons, then scale. Goal: before 30 December 2025, 100% of EU-bound lots carry a complete traceability dataset.

Frequently Asked Questions

What granularity of coordinates does EUDR require?
Geolocation for every production plot; surrounding polygons for plots over 4 ha. The EU cross-checks with satellite data, so coordinates must be accurate.
What about smallholders without coordinates?
Businesses must help smallholders measure (a GPS phone suffices for point coordinates), best done through cooperatives for standardisation. The costliest but mandatory layer.
Vietnam is low-risk — are coordinates waived?
No. Low-risk status (Reg (EU) 2025/1093) only simplifies the due-diligence procedure; coordinates and legality evidence remain mandatory in the statement.
When must Vietnamese goods carry full traceability data?
EUDR applies from 30 December 2025 for medium/large firms and 30 June 2026 for micro/small firms (counted on the EU importer side). Complete the system before these dates.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.