Corporate Legal Services

Pharma Distribution Disputes: Agencies & Bidding

A detailed shot of a hand holding a small pack of pink pills against a neutral background

Disputes in pharmaceutical distribution split into two tracks that must never be merged: disputes over drug tender results at public healthcare facilities — which follow the petition and complaint mechanism of the Law on Bidding 22/2023/QH15; and agency and distribution contract disputes between a manufacturer and its distributor — which follow the contract and commercial and civil law. Filing on the wrong track is the most common error: a bidder takes its grievance about a tender result to “complain” to a distribution partner, or a distributor takes an agency contract dispute to the bidding authority — both are returned for using the wrong mechanism.

Track one: where to complain about a drug tender result

The headline question answered directly: a complaint (petition) about the result of contractor selection for drug supply is filed with the project owner — the public healthcare facility that organised the package — and, under the petition-settlement sequence in bidding, with the person competent to decide the investment where the bidder disagrees with the project owner’s settlement. Three practical conditions decide whether the complaint is entertained: the complainant must be a bidder that participated in that package; the complaint must be filed within the statutory time limit from receiving the notice of contractor selection results — late filing forfeits the complaint right however right the content is; and the content must attach to the bidding documents, the bid dossier and the evaluation outcome (drug group criteria, technical scores, evaluated price), not to general market grievances. While a petition is being settled, contract signing and performance for the package are affected as prescribed by the Bidding Law — this is the losing bidder’s only lawful procedural lever, and it lapses if the complaint conditions are not met. Note also that drug tender results are heavily driven by the product’s technical group position under Circular 07/2024/TT-BYT and the domestic-drug preference mechanism in Article 56 of the Law on Bidding 22/2023/QH15 — many “winning disputes” actually begin with the product being grouped incorrectly before bids were even opened.

Track two: agency and drug distribution disputes

The manufacturer–distributor relationship for drugs is governed by agency and distribution contracts under the Law on Commerce 36/2005/QH11 and the Civil Code 91/2015/QH13: territorial exclusivity, minimum sales targets, termination conditions and post-termination stock handling, and drug storage under GDP conditions along the distribution chain. Unlike food (see the article on food distribution agency disputes), drug distribution adds a pharmaceutical sector layer: the distributor must meet pharmaceutical business conditions and good distribution practice; an “absolute exclusivity” agency clause still cannot override those conditions, and disputes over drug quality during distribution (broken cold chain, expiry) return to the quality liability mechanism of the Pharmacy Law. Agency disputes are resolved under the contract’s dispute clause — negotiation, commercial arbitration or court — not through the bidding complaint mechanism.

Frequently Asked Questions

Dispute over winning a drug tender: where to complain?

A complaint (petition) about the contractor selection result for drug supply is filed with the project owner — the public healthcare facility that organised the package — under the petition-settlement mechanism of the Law on Bidding 22/2023/QH15; if the bidder disagrees with that settlement, it continues the petition to the competent person under that law’s sequence. Core conditions: the complainant participated in the package, files within the statutory time limit from receiving the result notice, and the content attaches to the bidding documents, bid dossier and evaluation outcome.

If the complaint is late, does the bidder have any other route?

The complaint right under the bidding petition mechanism lapses after the statutory time limit. Other routes exist but differ in nature: denouncing bidding-law violations to the state bidding authority or inspectorate where signs of violation exist; and a civil claim where unlawful conduct caused damage. These routes do not automatically suspend performance of the awarded contract the way a timely petition can.

If a product was placed in the wrong drug group, what should the complaint target?

The application of Circular 07/2024/TT-BYT grouping criteria and the evaluation criteria in the bidding documents: the bidder proves the product meets the criteria of the higher or correct group (announced GMP certification, bioequivalence, origin) and that the wrong grouping changed the evaluation outcome. This is complaint content within the contractor selection result under the Law on Bidding 22/2023/QH15, filed with the right project owner and within the statutory time limit.

Can a dispute with a drug distributor use the bidding complaint mechanism?

No. Agency and distribution disputes are commercial contract disputes under the Law on Commerce 36/2005/QH11 and the Civil Code 91/2015/QH13, resolved under the contract’s clause: negotiation, arbitration or court. The petition mechanism of the Law on Bidding 22/2023/QH15 applies only to contractor selection in a specific package. Violations of pharmaceutical business conditions and good distribution practice in the chain fall under the drug authority’s inspection competence instead.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.