Contents
- 1. Overview
- 2. New points directly affecting EPC
- 3. Practical impact on EPC contractors
- 4. Immediate action items
- 5. Open points to monitor
- 6. Frequently asked questions
- 7. Language versions
- 8. References
1. Overview
Vietnam's bidding legal framework has just undergone a major update:
- Law No. 90/2025/QH15 amending the Law on Bidding — effective 01/7/2025.
- Decree 214/2025/ND-CP guiding the Bidding Law, successively amended by Decrees 165/2026, 170/2026 and most recently Decree 349/2026/ND-CP — effective 09/9/2026.
For EPC (engineering–procurement–construction) contractors, this is not "the public investor's law" — most infrastructure, energy and industrial projects that Chinese/Vietnamese EPC contractors join go through bidding or are directly affected by these rules.
2. New points directly affecting EPC
2.1. Updated direct-contracting thresholds (Decree 349/2026)
Decree 349/2026/ND-CP updates the thresholds for direct contracting. EPC contractors must know the new thresholds to determine whether their package falls under open bidding, competitive chào hàng or direct contracting — each with different bidding strategy and margins.
2.2. Duty to update contract progress and subcontractor info (Decree 349/2026)
Notably, the decree adds duties to update contract implementation progress and subcontractor information. Under the EPC model — where the main contractor manages dozens of subcontractors — this reporting duty significantly increases the administrative compliance burden during execution.
2.3. Tighter capacity and experience conditions (Law 90/2025)
Law 90/2025/QH15 revises contractor selection rules, including capacity and experience assessment. EPC contractors — especially foreign contractors in consortium with Vietnamese partners — must re-examine how they evidence capacity under the new criteria.
2.4. Transitional provisions
Packages with approved contractor-selection plans before the new instruments' effective dates follow transitional provisions — but the "how far along means which law" boundary must be determined per package.
3. Practical impact on EPC contractors
- Higher compliance costs: progress and subcontractor update duties demand more professional contract administration — smaller contractors will feel the strain.
- Disqualification risk: missing new thresholds and selection methods → wrong filing → eliminated at the dossier stage.
- Subcontractor governance: subcontractor lists, capacity and progress are now updateable items — requiring tighter subcontract terms (audit rights, information duties).
- Opportunity: a more transparent framework curbing arbitrary direct contracting — genuinely capable contractors benefit long-term.
4. Immediate action items
- ☐ Review the new frame: map Law 90/2025/QH15 and Decree 349/2026/ND-CP against current bidding procedures.
- ☐ Update bid templates: evidence capacity and experience under the new criteria.
- ☐ Build progress-update processes: assign owners for contract-progress and subcontractor-information reporting.
- ☐ Review subcontracts: add information-provision and reporting-cooperation duties.
- ☐ Check transitional treatment per ongoing package — old or new frame.
5. Open points to monitor
- Detailed guidance on templates and frequency for progress and subcontractor updates — awaiting guiding instruments or practice.
- How investors interpret and apply the new direct-contracting thresholds in specific selection plans.
- Specific sanctions for update-duty breaches — monitor related sanction decrees.
6. Frequently asked questions
What is Law 90/2025/QH15 and when is it effective? The Law amending the Law on Bidding, effective 01/7/2025, revising contractor selection rules.
What's new in Decree 349/2026/ND-CP? Effective 09/9/2026, amending Decree 214/2025/ND-CP; updates direct-contracting thresholds and adds contract-progress and subcontractor-information update duties.
What should EPC contractors do now? Review bidding procedures under the new frame; update templates; build progress-reporting and subcontractor-governance processes; check transitional treatment per package.
EPC contractor needing a bidding-compliance review? Contact FLAT Law Firm.
7. Language versions
8. References
- Law No. 90/2025/QH15 amending the Law on Bidding (effective 01/07/2025) (Vietnam).
- Decree 214/2025/ND-CP; Decree 349/2026/ND-CP (effective 09/09/2026) (Vietnam).
- Content cross-checked at the time of writing (28/9/2026).