Labour and Employment

Changing Companies but Keeping the Title: New Work Permit?

A Man and a Woman in a Meeting.

An expert is technical director at company A and is invited by company B to take exactly the same technical director title. The title does not change, the person does not change — so can the work permit be “carried over”? The answer is no, and this is one of the costliest misconceptions in foreign-staff management in Vietnam. This article analyses why changing companies always means a fresh permit, and separates the case from a title change within the same company — the situation analysed in article EXP-1565 in this wave, where the employer does not change and the handling mechanism is entirely different. The general procedure for changing information on a work permit is also available in article FDI-LC-1267 on this site.

1. The permit names the employer: a new employer means a new permit

A work permit under Decree 219/2025/ND-CP is issued for one worker to work at one identified employer, in one identified position. The enterprise’s name is part of the permit itself, not a decorative detail. The moment the working relationship with company A ends, the permit tied to company A has no basis to exist for any other work; working at company B on company A’s permit is work inconsistent with the permit — penalised under Decree 283/2026/ND-CP at a level similar to working without a permit, because for company B the worker effectively holds no valid labour document at all. An identical title changes nothing: licensing conditions are assessed per enterprise, because the foreign-labour demand, the position conditions and the management responsibility belong to each separate enterprise. On company A’s side, when the worker leaves, the enterprise must complete the permit-closing steps as prescribed (retrieval and return of the permit to the issuing authority in the cases requiring return), rather than keeping a departed worker’s permit as a company “asset”.

2. The correct process: fresh issuance at company B before the start date

Company B must run the full fresh-issuance process in Article 22 of Decree 219/2025/ND-CP: report and explain its own foreign-labour demand for the technical director position at company B, prepare the expert’s personal file (request form, health certificate, judicial record certificate, diplomas and experience confirmation for the position, passport, photos), file within the statutory window before the expected start date, and await issuance by the provincial authority. Personal documents still valid from the previous issuance (legalised diplomas, an in-date judicial record) can be reused, so preparation is usually faster than the first time, but no procedural step is waived. The most important consequence is scheduling: the expert may start work at company B only from the new permit’s effective date; any verbal arrangement of “start first, papers later” puts both sides in violation territory. A wise enterprise negotiates the contract start date by reference to the issuance milestone instead of fixing a rigid calendar date.

3. Visa and residence card when changing companies

A labour-category residence card is issued on the basis of the work permit, so when the company changes, the residence chain must be rebuilt on the new permit: the expert obtains a new residence card under company B’s work permit once it is issued. During the transition, the expert’s residence status needs careful checking: if the old card tied to company A has lost its basis and the new permit is not yet out, the expert may need to switch to an appropriate visa category or exit and re-enter depending on the concrete situation — a point to work out in advance with the immigration authority rather than on the card’s expiry day. Accompanying family members (spouse and children on family-visit status tied to the expert) must also synchronise their residence documents to the expert’s new card. The whole chain — new permit, new residence card, new family-visit cards — should be drawn as one single conversion calendar from the moment the expert accepts company B’s offer.

4. Common mistakes when changing companies

Four errors recur in practice. One, the expert starts at company B during a “probation” period before the permit is issued — probation is not an exception to the permit regime. Two, company B reuses company A’s demand explanation or file — each enterprise must have its own demand explanation. Three, forgetting to close the company A side: the labour contract not yet liquidated, the permit not yet processed for retrieval as prescribed, leaving the expert’s record at the labour authority still hanging at the old company when the new company files. Four, scheduling the start date by project need rather than by issuance progress, then pressuring HR to be “flexible”. All four errors are avoided by one principle repeated throughout this section: the start date at the new enterprise is the day the new permit takes effect, not one day earlier.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.