Common Mistakes Causing Fire-Design Rejections: Lessons for FDI Contractors

Man on fire truck spraying water on building

First, name the procedure correctly under the current framework

Under Fire Prevention, Fighting and Rescue Law No. 55/2024/QH15 (in force 1 July 2025) and guiding Decree 105/2025/ND-CP, construction design now goes through fire design appraisal by the construction-specialised authority within the project appraisal process, alongside fire design approval by the police authority for content under police competence as decentralised in Decree 105/2025/ND-CP (amended by Decree 347/2026/ND-CP, in force 15 September 2026). FDI contractors used to a single police-window model from older translations keep filing under that assumption — while the current framework splits competence by project type and design content. Filing to the wrong authority is the first formal error group that gets files returned.

The second error group is misjudging the filing scope: a project on the mandatory fire appraisal list in the annexes of Decree 105/2025/ND-CP is filed as an ordinary construction appraisal, or the reverse — non-mandatory items are filed with substandard fire drawings, voluntarily creating amendment comments that never needed to exist. Before drawing anything, the project team must settle two questions: is the project on the mandatory fire appraisal and approval list, and which authority is the counterpart for each content part.

The technical error group: drawings that cannot be checked against the code

This group accounts for most returns on FDI factory files. Typical error one: escape solutions that do not match the national technical regulation on fire safety for buildings — escape distances, exit counts and corridor widths calculated on the production line’s real headcount while the drawings use a lower nominal headcount. Error two: fire compartments and structural fire resistance limits inconsistent between the narrative and the floor plans, especially in raw material stores, finished goods stores and forklift battery charging areas — high fire-load spaces often drawn as ordinary stores. Error three: automatic fire alarm and suppression systems designed to a foreign standard without mapping to applicable Vietnamese regulations and standards; foreign standards may only be used within what construction and fire law permits, and the narrative must identify the equivalent provisions.

Error four, very characteristic of FDI projects: fire drawings and process drawings produced by two different design firms, with process line changes at technical design stage never updated into the fire drawings, so the filed project on paper differs from the project to be built. Error five: missing or mismatched documentation for finishing and fire-proofing materials — conformity certificates and fire resistance test results for doors, partitions and fire paint not attached, or not matching the types actually to be installed. The most effective prevention is one internal cross-check round against the appraisal authority’s recurring comment list before filing, instead of filing early and amending in circles.

What a return actually costs, and how to choose the fire consultant

A returned file for amendment is not a penalty — no fine arises merely because the file is not yet compliant. The real cost is time: each amendment round delays the construction permit and groundbreaking, and for an FDI project with schedule commitments in the Investment Registration Certificate, delayed groundbreaking can force an investment project schedule adjustment. Penalties arise for different conduct: building before an approved appraisal result exists, or building contrary to the appraised fire design — administrative fines in the fire field and possible construction suspension. The correct mindset is to treat fire appraisal as a schedule gate before construction, not a supplementary formality afterwards.

When hiring a fire consultant, an FDI contractor should check four points: whether the design firm meets the practising capacity conditions for fire design under construction law; experience with the exact project type (an electronics plant differs from a logistics warehouse, which differs from a chemical plant); the commitment on amendment rounds and liability where returns are caused by design errors; and handover of the complete source file set so the investor stays in control when designs change later. One important update: under Resolution 66.18/2026/NQ-CP, from 1 July 2026 the police inspection of fire acceptance work in Article 10 of Decree 105/2025/ND-CP is abolished and the investor self-organises acceptance under Article 8 — this does not lighten design appraisal; with ex-post inspection reduced, the quality of the design appraised upfront becomes the project’s principal legal anchor.

Frequently asked questions

What mistakes most often get fire files returned?

Three main groups: filing to the wrong authority under the decentralisation in Decree 105/2025/ND-CP and misjudging the mandatory appraisal list; technical errors — escape routes, fire compartments and fire resistance limits not matching fire safety regulations or inconsistent between narrative and drawings; and synchronisation errors — process changes not updated into fire drawings, and missing fire-proofing material certificates matching the types to be installed.

How long does resubmission after a return take?

The law sets no single day count for every resubmission; timing depends on how many comments must be addressed and whether a full re-appraisal or only supplementation of the requested parts is needed. In practice each amendment round adds the authority’s processing time to the construction permit schedule — plan for at least one amendment round in the groundbreaking timeline.

What should be checked when hiring a fire consultant?

Check the firm’s practising capacity conditions for fire design, its experience with your exact project type, its commitment on amendment rounds and liability for design-caused returns, and full handover of source drawing files. Do not choose on price alone: the cost of repeated amendments and delayed groundbreaking usually exceeds any fee difference.

Can repeated returns lead to a fine?

No. A return for amendment is an appraisal outcome, not a sanction. Fines arise from different conduct: building before an approved appraisal, building contrary to the appraised fire design, or putting the works into use in breach of acceptance rules — these draw administrative penalties in the fire field and possible suspension.