The licence chain of a refining project: there is no single licence
Deep mineral processing — refining ore into metal, oxides or high-content products — sits at the intersection of three legal systems: geology and minerals law (Geology and Minerals Law No. 54/2024/QH15, in force 1 July 2025, replacing the 2010 Minerals Law), investment law (Investment Law No. 143/2025/QH15, in force 1 March 2026) and environmental, construction and technology law. Mineral processing activity requires a mineral processing licence under geology and minerals law where it is standalone processing or attached to mining; the plant investment project must pass investment policy approval at the level corresponding to its scale, because mineral mining and processing projects belong to the group requiring policy approval and environmental impact assessment at central or provincial level by decentralisation.
The point foreign investors most often under-assess is feedstock: a processing licence does not itself create a right to ore. A refinery must prove a lawful ore source — from its own licensed mine, from purchase contracts with licensed miners, or from imported ore with valid dossiers. An unlawful ore supply chain is the largest legal risk of a refining project in Vietnam, because processing minerals of unlawful origin is handled as conduct connected to illegal minerals. Refining project appraisal therefore always includes ore chain appraisal before technology appraisal.
Technology and environment: the two gates deciding whether the project proceeds
The technology gate: a mineral processing project must meet processing technology requirements under planning and sectoral rules — policy direction encourages modern technology, maximum recovery of useful minerals and restricts backward, high-consumption technology; a project receiving foreign technology transfer must register the technology transfer contract under the Technology Transfer Law (consolidated text after amending Law 115/2025/QH15) where registration is required. The environment gate is heavier than for ordinary industrial projects: a refinery usually belongs to the high adverse environmental impact risk group, requiring an approved environmental impact assessment before implementation, an environmental licence for operation, and hazardous waste management (slag, heavy-metal sludges) under its own regime.
A sector-specific duty: the mineral mining right fee attaches to the mining stage (calculated on reserves and the fee price basis), while the processing stage bears natural resource tax where the enterprise also mines, the environmental protection fee on mineral mining, and export duty where products are exported. In the financial model, the investor should separate compliance costs of the three stages — mine, plant, export — because an incentive at one stage does not automatically flow to the others.
Incentives for deep processing: real, but tied to specific conditions
Vietnamese policy encourages deep processing over raw ore export, and incentives show through three channels. The corporate income tax channel: an investment project in an incentivised sector or location under Corporate Income Tax Law No. 67/2025/QH15 and Investment Law 143/2025/QH15 may enjoy preferential rates and time-limited exemption or reduction; a qualifying high-tech project may additionally access the Investment Support Fund under Decree 182/2024/ND-CP for supported cost items. The land channel: incentivised projects are considered for land rent exemption or reduction under land and investment law. The export channel: deeply processed products bear markedly lower or zero export duty than raw ore in the export tariff, and some minerals may only be exported after meeting minimum processing standards — the largest structural incentive, analysed separately in the topic on raw versus processed mineral export taxes.
The condition for keeping incentives is preserving the approved project substance: changing technology in a way that lowers processing depth, switching to selling raw ore instead of refined product, or missing investment progress can remove the incentive basis and trigger recovery of incentives enjoyed. An FDI investor should write deep processing commitments as measurable terms in the project file from the start, so proving incentive eligibility in later periods is a file reconciliation, not a fresh argument.
Frequently asked questions
What licences does a mineral refining plant need?
A chain, not one licence: investment policy approval and investment registration under Investment Law 143/2025/QH15; a mineral processing licence under Geology and Minerals Law 54/2024/QH15; approved environmental impact assessment and an environmental licence; a construction permit and sectoral licences. The most tightly appraised baseline condition is a lawful ore source for the plant.
Does deep processing get tax incentives?
It can, on specific conditions: preferential corporate income tax by sector and location under Corporate Income Tax Law 67/2025/QH15; land rent exemption or reduction; lower export duty than raw ore; and large high-tech projects may be considered for the Investment Support Fund under Decree 182/2024/ND-CP. Incentives attach to the approved project substance — reducing processing depth or missing progress can forfeit them.
How does exporting refined minerals differ from raw ore?
In both tax and conditions: raw ore bears higher export duty and some minerals are restricted or exportable only after meeting minimum processing standards, while refined products bear lower or zero duty under the export tariff. Rate detail by commodity code is analysed in the separate topic on raw versus processed mineral export taxes.
Related articles
- Maternity Packages in Vietnam for Foreigners: 3 Tiers
- Dentistry in Vietnam for Foreigners: Prices & 5 Clinic Criteria
- Mental Health for Expats in Vietnam: 4 Support Channels
- Adult Vaccination in Vietnam: 6 Vaccines & Where to Get Them
- Emergency Care in Vietnam: Never Refused & 4 Payment Scenarios
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.