Exiting a factory is complex — exiting an energy project (solar, wind) is more so: value sits in the 20-year power purchase agreement (PPA) with EVN, not just panels and turbine towers; electricity licences don’t transfer automatically; specialised equipment has no resale market. This article builds the full budget framework for an energy divestment.
1. Why energy-exit budgets differ
- Large intangible value: long-term PPAs with EVN, licences, 20–25-year land rights — “paper” value can exceed equipment value;
- Specialised equipment: used panels and wind turbines — thin secondary markets, low liquidation prices;
- Long-tail duties: equipment warranties, environmental restoration, project-finance debt with 10–15 years remaining;
- Policy sensitivity: power prices and power planning directly hit value — policy shifts upend valuations.
2. Budget structure: 8 cost groups
| Cost group | Content | Note |
|---|---|---|
| 1. Project valuation | Valuation (DCF on PPA cash flows) | Largest preparation cost |
| 2. Deal legal | Two-country counsel, negotiation, IRC procedures | More complex than ordinary projects |
| 3. Transfer tax | CIT/PIT on capital-transfer income | Often the single largest item |
| 4. Project-debt handling | Prepayment / loan assignment | Project-finance terms are specific |
| 5. PPA transfer | PPA assignment/consent procedures with EVN | Needs EVN consent |
| 6. Electricity licences | Adjusting/converting electricity operation licences | Under Electricity Law 28/2024/QH15 |
| 7. Environment & restoration | Environmental deposits, restoration plans | Duties outlive the exit |
| 8. Personnel & operations | Handover of operations and maintenance teams | Equipment needs knowledgeable operators |
3. Valuing the energy project: DCF on PPA cash flows
- Primary method: discounted cash flow from the PPA over its remaining life (typically 15–20 years);
- Inputs: power price in the PPA, expected output (based on actual irradiation/wind data), O&M costs, discount rate;
- Risk adjustments: curtailment exposure, power-price policy changes, FX swings (foreign-currency debt, VND revenue);
- Independent valuation: both sides should agree on a valuer who understands renewables — generalist valuers misprice;
- Equipment-only value is usually far below operating-project value — don’t let the buyer “price it as scrap”.
4. The PPA: transferable?
- The PPA is between the project company and EVN — selling the company’s equity (not assets) leaves the PPA effective (the contracting party is unchanged);
- But PPAs often carry change-of-control clauses — a controlling transfer may need EVN’s consent;
- Selling project assets (not the company): PPA assignment needed — far more complex, EVN re-vets the buyer;
- PPA power price: the value driver — old FIT-price PPAs differ from newly negotiated-price PPAs;
- Timing: EVN procedures take 3–6 months — build into the schedule.
5. Electricity licences under the 2024 Electricity Law
Under Electricity Law 28/2024/QH15 (effective 01/02/2025):
- Electricity operation licences go to qualifying entities — ownership changes require licence amendment;
- The buyer must meet capacity conditions (financial, technical, personnel) — not everyone qualifies;
- Amendment takes time — never leave the project “unlicensed” during handover;
- Related licences: environmental, fire-safety, land — review consistently.
6. Project-finance debt: the biggest knot
- Energy projects typically borrow 70–80% of total capital — tens of millions in debt;
- Project-finance credit contracts carry tight change-of-control clauses — ownership changes can trigger acceleration;
- Options: (a) buyer assumes the loan (bank consents); (b) repay from sale proceeds; (c) refinance with a new bank;
- Collateral: project assets (equipment, PPA receivables, land rights) are mortgaged — transfers need bank consent;
- Negotiate with the bank before signing the transfer agreement — the deal is only solid when the bank nods.
7. Environmental and restoration duties
- Energy projects post environmental deposits — on transfer, handle the deposit (assign to buyer or refund);
- Restoration plans: at end of project life (25 years), who dismantles, who pays — the duty follows the project; the buyer inherits;
- Expired solar panels: e-waste — disposal costs belong in the valuation;
- Pre-transfer environmental liability sits with the seller — warranties and escrow needed.
8. Tax on the energy deal
- Capital-transfer tax: as in ordinary deals (20% CIT on income) — but large values mean large tax;
- Ongoing tax incentives: renewable projects may enjoy CIT incentives — equity transfers don’t kill the company’s incentives (the entity survives);
- VAT: equity transfers aren’t VAT-able; asset sales (if structured so) are;
- Refunds: remaining creditable VAT — handled at finalisation.
9. Operations personnel: the intangible asset
- Power plants need operations teams who understand the equipment — lose the people, the plant “stops”;
- On exit: retain key personnel (stay bonuses, transitional contracts);
- Operations technology handover: documents, procedures, monitoring software (SCADA) — complete;
- Third-party O&M contracts: assignable? change-of-control clauses.
10. Sample budget framework (indicative ratios)
For a mid-size solar project, exit costs typically split:
- Capital-transfer tax: the largest item — compute precisely from price and cost base;
- Advisory fees (lawyers, auditors, valuers): a few % of deal value;
- Debt-handling costs (prepayment fees, refinancing fees): per the credit contract;
- Procedural costs (IRC, licences, EVN): small but time-consuming;
- Risk provision (escrow): 5–15% of deal value for contingent duties (environment, tax, warranties).
Budget before negotiating price — the sale price must cover exit costs for the deal to make sense.
11. Energy-exit timeline: 9–15 months
Months 1–3: diligence, valuation, audit. Months 3–6: negotiation, conditional signing. Months 4–8: bank (project debt) and EVN (PPA) work in parallel. Months 6–10: IRC and electricity-licence procedures. Months 9–15: payment completion, operations handover, tax finalisation. Energy projects can’t exit fast — compressing the bank/EVN stages only breaks the deal.
12. Insurance during the exit transition
Energy projects carry specialised insurance — property, business interruption, third-party liability — that must be managed through the exit:
- Continuity: never let coverage lapse during handover — a turbine fire in the gap week is uninsured;
- Policy transfer: insurance policies are contracts of the project company — equity sales don’t terminate them, but notify the insurer of the ownership change (non-disclosure can void claims);
- Premium allocation: agree who pays premiums for the transition period — prorate by closing date;
- Claims in flight: pending insurance claims (storm damage, equipment failure) are project assets — assign them explicitly in the transfer agreement, or the seller keeps the proceeds of pre-closing events.
13. Land-lease transfer in industrial parks — and outside them
Energy projects sit on large land areas — often outside industrial parks (solar farms, wind ridges). Land handling on exit:
- Industrial-park projects: sublease contracts usually allow assignment with the park developer’s consent — straightforward;
- Off-park projects: land leased directly from the State or subleased from land-use-right holders — transfers need authority approval and take longer;
- One-off vs annual payment: one-off-payment land rights have transferable value; annual-payment rights transfer with the lease but carry no capitalised value;
- Mortgaged land rights: project-finance banks hold mortgages over land rights — the bank must consent to any transfer;
- Remaining tenor: land with 10 years left is worth less than land with 20 — factor the remaining term into valuation.
Decommissioning cost provisions
Energy projects can’t just be switched off — decommissioning is a regulated, costed process:
- Site restoration: the land lease usually requires returning the site to an agreed condition — price the earthworks;
- Equipment disposal: turbines, panels, and transformers need certified dismantling — some components are hazardous waste;
- Grid disconnection: coordinate the disconnection procedure with the power purchaser and grid operator;
- Provision booking: recognise the decommissioning provision in the accounts — buyers check this line;
- Regulatory sign-off: closure needs environmental acceptance — start the paperwork early.
Budget contingency planning
Exit budgets overrun. Build contingencies the board will actually approve:
- Rate it: apply 10–15% contingency to soft costs (advisers, filings) and 5–10% to contracted works — as a planning illustration, not a market quote;
- FX buffer: add a currency margin — the budget is in VND, the investor thinks in RMB;
- Delay cost: quantify the monthly burn rate if approvals slip — it focuses minds;
- Release gates: tie contingency drawdowns to milestones, not to requests;
- Report rhythm: monthly budget reviews against the exit plan keep surprises small.