The most dangerous habit of FDI enterprises with short-term experts is the phrase “they are only here for a few weeks, so no paperwork is needed”. Decree 219/2025/ND-CP, replacing Decree 152/2020/ND-CP, has closed that gap: a foreigner entering to work for under 90 days in a year indeed falls outside the work permit scope, but the enterprise must FILE A NOTIFICATION at least three working days in advance. Skipping this seemingly small procedure turns a perfectly normal technical trip into improperly documented work when inspected.
Where the under-90-day category sits in Decree 219/2025/ND-CP
Decree 219/2025/ND-CP reorganises the entire regime for foreigners working in Vietnam in place of Decree 152/2020/ND-CP. In the new frame, cases outside the work permit scope are listed in Article 9, and clause 4 of that article addresses exactly the most common situation at FDI plants: a foreigner entering Vietnam to work for a short period, with total working time under 90 days in one year. This group needs no work permit and does not pass through the exemption-confirmation procedure used for some other categories, but in exchange the employing enterprise must notify the competent authority — the Department of Home Affairs where the person is expected to work — at least three working days in advance, with information on the worker and the working time and place. The legislator’s logic is clear: the State does not want to block short-term experts with a full licensing procedure, but will not accept them being invisible to the management system either.
How is the 90-day threshold counted, and what mistakes are common?
The threshold is counted on that individual’s total actual working time in Vietnam within one year, not per individual trip. An engineer making four trips of 25 days each reaches 100 days and exits the notification category — from the day of excess, that person must be brought under a work permit or another fitting exemption category, and continuing to work under the notification route is the wrong category. Three common enterprise mistakes: first, counting days by flight schedule instead of actual working days at the site, so the tracking log is wrong from the start; second, forgetting to accumulate across legal entities of the same group when the expert rotates between two plants — the threshold belongs to the individual worker, not to each employing enterprise; third, remembering the notification only after the three-working-day deadline, when the expert has already arrived, while the notification is a BEFORE-work procedure with no cure mechanism afterwards. The enterprise should maintain a presence-and-work day log per individual, updated as soon as each trip is scheduled, rather than reconstructing it from entry-exit stamps at year end.
Related regime: when must the enterprise return to a full work permit?
As soon as the expert’s work programme exceeds the short-term threshold or becomes regular, the enterprise must return to the standard regime: approval of the need to employ foreign labour and a work permit with a maximum term of two years, extendable once, under the Decree 219/2025/ND-CP framework. On sanctions, using foreign labour in the wrong category — no permit where a permit is required, no notification where the notification category applies — is administratively penalised under the labour penalty decree, currently Decree 283/2026/ND-CP replacing Decree 12/2022/ND-CP with the convention that base fines are for individuals and double for organisations, and the worker may face expulsion in serious cases. The practical arithmetic shows the compliance cost of the notification route is near zero compared with penalty and project-disruption risk: an engineer forced to stop work mid-commissioning causes more damage than many years of advisory fees combined.
Frequently Asked Questions
In which cases is a foreign expert working under 90 days not subject to a work permit under Decree 219/2025?
No work permit is needed. Under clause 4, Article 9 of Decree 219/2025/ND-CP, a foreigner entering Vietnam to work for a total of under 90 days in one year falls outside the work permit scope. But this category does not mean “no procedure”: the enterprise must notify the Department of Home Affairs where the work is expected, at least three working days in advance. Confusing the two concepts is the most common error leading to penalties even where the expert fully qualifies for the permit exemption.
To which authority must the enterprise notify or seek confirmation of the work-permit-exempt status before the expert starts work?
The employing enterprise sends the notification to the Department of Home Affairs of the province or city where the foreigner is expected to work, at least three working days in advance, stating the worker’s identification information, job position, and expected working time and place. Because the notification precedes the start of work, it must be built into the trip schedule: once the expert’s dates are fixed, file immediately rather than waiting for the flight day. Keep the filed notification with its receipt stamp or acknowledgement to produce during an unannounced labour inspection at the site.
How is the exemption counted for an expert entering Vietnam many times a year, each time under 90 days?
It is counted by TOTAL working time accumulated within one year, not per entry. Under clause 4, Article 9 of Decree 219/2025/ND-CP, the work-permit-exempt status covers a foreigner entering to work for a total of under 90 days in one year — each trip may individually be under 90 days, but once the year’s accumulation reaches or exceeds 90 days, that person no longer falls within this category. The enterprise must itself track the accumulated working-day ledger for each expert, together with the notification to the Department of Home Affairs at least three working days before the work programme. From the moment the threshold is crossed, the enterprise must move to the proper regime: demand approval and a work permit — maximum term two years, renewable once — or identify another genuinely applicable exempt category; continuing to work under the notification category past the threshold is use of labour in the wrong category and is penalised.
How is misuse of the work-permit-exempt status penalised, and what are the consequences for the expert?
From the moment the threshold is exceeded, that individual no longer falls within the notification category of clause 4, Article 9 of Decree 219/2025/ND-CP. The enterprise must move to the fitting regime: obtain need approval and a work permit (maximum two years, extendable once) or identify another genuine permit-exempt category if truly satisfied. Continuing to work under the notification route after exceeding the threshold is employment in the wrong category, penalised under Decree 283/2026/ND-CP and disruptive to that expert’s own work programme.
Set up short-term expert tracking with FLAT Law Firm
FLAT Law Firm helps FDI enterprises build a per-expert working-day accumulation log, notification templates under Decree 219/2025/ND-CP filed inside the three-working-day deadline, and timely switch rules to a work permit when the work programme crosses the 90-day threshold.
Related articles
- Returning to Work in Vietnam After Cancelling Permit/TRC: Any Impact?
- Does a Single-Member Foreign-Owned LLC Owner Need a Work Permit?
- Capital Contributors Over VND 3 Billion: Work Permit Exempt?
- Do Board Chairs and Members Need Work Permits?
- Experts Entering Vietnam Under 30 Days: Exempt?
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.

