A developer’s verbal “quota still available” is not evidence. The foreign quota is a moving number — every new registration changes it — so you need dated, written proof from sources that actually track it.
Where the official list lives
Under Decree 95/2024/ND-CP, which implements the Housing Law 2023, provincial Departments of Construction publish the list of housing projects permitted to sell to foreign organisations and individuals. Start there: if the project is absent from the list, no foreign sale can lawfully proceed, whatever the sales team claims.
Four checks, in order
- Department of Construction list — confirm the project is licensed for foreign sales at all.
- Developer’s written quota statement — ask for the current count of foreign-owned units in the specific tower or block, dated and stamped. Compare it against the 30% ceiling yourself.
- Notary / land registration office — at the contract stage, the notary verifies eligibility; the land office is where registrations — and therefore the real-time count — actually happen.
- Contractual protection — put a clause in the deposit agreement and the sale contract: the seller warrants that foreign quota remains available, with a full deposit refund if registration is refused on quota grounds.
Red flags
- A quota figure with no date — stale numbers are the most common trap.
- Counting “reservations” instead of registered ownership — only registered titles consume quota.
- Pressure to pay the deposit before the written confirmation arrives.
Frequently Asked Questions
Who publishes the official list of projects open to foreigners?
The provincial Department of Construction publishes the list of projects licensed to sell to foreigners under Decree 95/2024/ND-CP. If the project is not on it, a foreign sale cannot lawfully proceed.
How do I verify the remaining quota in a specific building?
Ask the developer for a dated, stamped statement of the current foreign-owned count in that tower or block, and check it against the 30% ceiling. The definitive count sits with the land registration office, which records every title.
Can I make the deposit refundable if the quota turns out to be full?
Yes — insert a warranty clause that foreign quota is available, with a full refund of the deposit if the authorities refuse registration on quota grounds. This is standard protective drafting.
Related articles
- Construction delays: how are contractual penalties calculated?
- Construction warranties: minimum warranty periods by project grade
- Construction acceptance: procedures, participants and acceptance records
- Payment and final settlement of construction investment capital: procedures and timelines
- Adjusting construction contract prices when material prices fluctuate
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.

