IRC Rejected Over Outdated Technology or Pollution Risk

Small black old fashioned derelict television placed under concrete bridge on metal structure with corrosion on street against blurred background

The setup: an investor brings a 20-year-old electroplating line into Vietnam, declaring it the group’s existing technology. The IRC dossier is rejected after the technology consultation: the line is chemical-intensive, threatens water pollution, and fails the technology-use conditions. The investor insists the machines still run fine — but investment law does not ask whether machines run; it asks whether the technology may be transferred into Vietnam.

Two gates: technology and environment

  • The technology gate. Point e, Clause 3, Article 39 of Decree 96/2026/ND-CP requires projects subject to technology consultation to meet technology-use conditions under the technology-transfer legislation (Law 115/2025/QH15 amending the Technology Transfer Law, effective 1 April 2026). Technology on the banned or restricted transfer lists, unexplained, stops the dossier here.
  • The environment gate. Projects with environmental risk must prepare an environmental impact assessment report under the Environmental Protection Law 72/2020/QH14. Failing environmental requirements blocks the IRC even if the technology passes.

The law adds a long-term barrier: Article 31 of the Law on Investment 143/2025/QH15 provides that projects using outdated technology, posing pollution risks or being resource-intensive may not extend their operation term. Getting an IRC today on old technology locks the door on tomorrow’s extension.

What does the technology explanation dossier need?

For projects required to explain their technology, the IRC file needs: technology name and origin; process flow diagrams; key technical parameters; and the usage status of principal machinery, equipment and lines (year of manufacture, years in service). Missing or perfunctory entries here are a common reason agencies request supplements and then reject.

Rejected over technology: three remedies

  • Upgrade the line: replace outdated equipment with technology meeting environmental standards, then refile with an updated explanation.
  • Narrow the technology scope: drop the high-pollution stage (e.g., outsource plating), registering only the clean stages.
  • Add environmental safeguards: wastewater and exhaust treatment meeting technical regulations, plus monitoring commitments — older technology with strong safeguards can still be considered.

Frequently asked questions

1. Which technologies are banned from transfer into Vietnam?

The banned and restricted technology-transfer lists issued with the technology-transfer legislation; investors should check before designing the project rather than waiting for the agency’s verdict.

2. May used machinery be imported as project assets?

Yes, subject to equipment-age and technology standards; excessively old, technologically obsolete machinery is grounds for IRC refusal.

3. Who appraises the project’s technology?

The investment registration agency consults the state science-and-technology authority; that opinion is one basis for granting or refusing the IRC.

4. When must a project prepare an environmental impact assessment?

Under the criteria in the Environmental Protection Law 72/2020/QH14 and guiding documents: projects with assessable adverse environmental risk must prepare, appraise and approve the report before implementation.

5. Can a technology-based rejection be fixed?

Yes. Switch to compliant technology or add environmental safeguards, then refile; nothing bars refiling after a technology-based refusal.