Scenario: a group appoints a Korean plant director for its Bac Ninh factory and wants the labor contract to carry a hard KPI set: miss the output target two quarters running and the company may terminate immediately, plus a monetary fine clause for safety-target breaches. The draft contains both usable clauses and void ones. Drafting a labor contract for a senior foreign manager is a balancing act between the group’s governance tools and the hard limits of Vietnam’s Labor Code.
KPI clauses: they bite only when tied to the appraisal criteria system
The sole basis for terminating a labor contract on performance is Point a, Clause 1, Article 36 of the Labor Code — regular failure to complete the work — with completion levels determined by work-completion appraisal criteria issued by the employer after consulting the workplace employee representative organization. The direct drafting consequence: the KPI table in the plant director’s contract (output, defect rate, safety, cost) only supports termination if it embodies that appraisal criteria system — the KPIs must be referenced into the company’s appraisal regulation, be measurable, and be appraised over recorded periods. A clause “miss KPIs two quarters and termination is immediate” creates no instant termination right: even with the director’s signature, the company must still pass through the Article 36 basis, “regular” data across appraisal periods, and notice of 30 or 45 days by contract type.
A safe KPI design has three layers: layer one is the position description and quantitative targets with measurement cycles (quarterly) in a contract annex; layer two is the appraisal process — who appraises, from which systems the data comes, results discussions and documented improvement opportunities; layer three is graduated consequences — a first miss triggers an improvement plan, repeat misses across periods build the “regular failure” file. This three-layer structure turns KPIs from a management slogan into a usable legal file when a very highly paid senior manager must be exited.
Bonus clauses: Article 104 and the commitment boundary
Under Article 104 of the Labor Code, a bonus is money, assets or other forms the employer grants based on production and business results and work completion levels; the bonus regulation is decided by the employer and publicly announced at the workplace after consulting the employee representative organization. Where the director’s labor contract states a specific bonus formula (for example an annual bonus at a rate of after-tax profit if the plant hits an output threshold), that formula is a binding contract term, distinct from the discretion in the general bonus regulation — the company cannot at year-end invoke “the bonus regulation is ours to decide” to refuse a formula committed in the individual contract. Conversely, if the group wants flexibility, the contract must say so in nature: bonuses follow the company’s current bonus regulation and competent authority decisions, with no numbers or formulas stated as commitments.
Two prohibited or void clauses must be avoided absolutely in the draft: one, any monetary fine clause for target breaches — Clause 2, Article 127 of the Labor Code prohibits fines as a form of labor discipline, and KPI-based salary deductions are not a statutory discipline form either. Two, salary deduction clauses for compensation outside the Article 102 and 129 mechanism (property damage only, capped at 30% of net pay after withholdings). For a director’s serious safety breach, the correct tools are labor discipline under the internal rules (up to dismissal if within Article 125) or Article 36 termination — not a group-invented “internal fine”.
The foreign layer: work permits and management tenure
A foreign plant director’s labor contract is locked to the work permit cycle under Decree No. 219/2025/ND-CP: permits are issued for a maximum of 02 years each time, tied to the approved position. Definite-term contracts are designed around this cycle (for instance 02 years, re-signed in sync with permit renewal), avoiding contract terms longer than actual permit validity because the excess cannot be lawfully performed. The title in the work permit file (manager, executive director or expert as defined by the decree) must match the title and job description in the labor contract — title mismatch is the classic file defect that triggers queries at renewal.
Finally, if the director is simultaneously the legal representative or a member of the company’s management bodies, the corporate relationship (appointment and removal under the Law on Enterprises and the charter) and the labor relationship are two independent layers: removing the management title does not automatically end the labor contract, and ending the labor contract does not automatically remove corporate office. Personnel documents for this position should include a clear two-layer map from signing day: the labor contract, the appointment decision, and rules for when one layer ends before the other.
Frequently Asked Questions
Is a clause “miss KPIs two quarters and we terminate immediately” enforceable?
It creates no immediate termination right. Performance termination has one basis only: Point a, Clause 1, Article 36 of the Labor Code — regular failure to complete work measured by appraisal criteria the employer issued after consulting the employee representative organization — with notice by contract type and severance. A contract KPI clause helps only when tied into that appraisal criteria system and measured, recorded across periods.
Is a formula-based bonus promised in the contract compulsory to pay?
It binds as a contract term: once a specific formula sits in the individual labor contract, the company cannot invoke the discretion of the Article 104 bonus regulation to refuse the committed part. To preserve flexibility, the contract must characterize bonuses as following the current bonus regulation and competent decisions, without formulas stated as commitments. The Article 104 regulation itself must be publicly announced at the workplace after consulting the representative organization.
Can we fine the director for breaching safety targets?
No. Clause 2, Article 127 of the Labor Code prohibits monetary fines in labor discipline, and KPI salary deductions are not a statutory discipline form. Lawful tools for a serious breach are discipline under the internal labor rules (up to dismissal where Article 125 applies), Article 36 termination for regular underperformance, and property-damage compensation under Articles 102 and 129 within statutory deduction caps.
How should the foreign director’s contract term align with the work permit?
Around the permit cycle: permits under Decree No. 219/2025/ND-CP run at most 02 years per issuance for the approved position, so definite-term contracts are typically designed at 02 years and re-signed in sync with permit renewal. The permit-file title (manager, executive director, expert) must match the contract title and duties; contract time beyond permit validity is time that cannot be lawfully performed.
Related articles
- Social Insurance Japan vs Vietnam: the 15% Cost and Leaving-Country Benefits
- Minimum Wage in Hong Kong vs Vietnam: Adjustment Mechanism and Trends
- Minimum Wage in Taiwan vs Vietnam: Adjustment Mechanism and Trends
- Minimum Wage in Philippines vs Vietnam: Adjustment Mechanism and Trends
- Minimum Wage in Malaysia vs Vietnam: Adjustment Mechanism and Trends
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.

