A data center is a special power customer: large load, continuous 24/7 draw and reliability demands far beyond an ordinary factory. Under Electricity Law No. 61/2024/QH15, large electricity customers connect at matching voltage levels and technical conditions, contracting with the retail electricity unit or through the competitive power market depending on participation level. Real negotiation turns on registered capacity, load profile, power factor and minimum off-take commitments, because the utility must invest in a dedicated substation and lines for a load in the tens of megawatts.
How a large-load power purchase actually works in practice
The direct power purchase mechanism (DPPA) in Decree 80/2024/ND-CP, as amended by Decree 57/2025/ND-CP, lets large customers buy power from solar and wind plants under two models: physical purchase over a private line, and synthetic purchase through the national grid paired with a contract for differences. A data center whose average consumption sits in the decree’s large-customer band is the archetypal synthetic DPPA user, because that model needs no private line yet still lets the business evidence its renewable share for ESG goals.
DPPA: buying renewable power directly under two models
When a grid outage causes downtime for rack tenants, liability splits across two separate contract layers. Between the data center and the utility, the power purchase contract and power-quality rules confine the seller’s liability within published frames, and an ordinary grid incident rarely yields compensation matching end customers’ business loss. Between the data center and its rack tenants, the SLA governs: the data center promises uptime based on its own redundancy, so it cannot push everything onto the grid event if its UPS and generators failed to perform as designed.
When an outage hurts end customers: who compensates whom
A careful investor handles power risk in three document layers: capacity and energisation milestones in the connection agreement signed before construction, because late power is the project’s biggest schedule risk; the DPPA structure stating that renewable energy certificates belong to the buyer and how output shortfalls are settled; and SLA wording that allocates clearly which grid events count as beyond control and which fall to the data center’s redundancy responsibility.
Frequently Asked Questions
How does a data center drawing tens of megawatts contract for power?
Register as a large electricity customer under Electricity Law 61/2024/QH15, agree connection at the voltage level matching capacity with dedicated energisation milestones, then sign the purchase contract with the retail unit or join the market at the eligible level.
Can a data center buy solar power directly through DPPA?
Yes, if it falls in the large-customer group under Decree 80/2024/ND-CP as amended by Decree 57/2025/ND-CP; choose the physical model over a private line or the synthetic model through the grid with a contract for differences.
Who compensates customers when a sudden outage causes loss?
Toward rack tenants the data center answers under its SLA and redundancy promise; claiming against the utility is confined by the power purchase contract and power-quality rules and rarely matches downstream business loss.
Related articles
- Online Lending Rates: Interest Caps and Fees
- Digital Securities and Online Brokerage: Conditions
- Pilot Digital Asset Exchanges: Participation Conditions
- Suspicious Transactions in E-Wallets: Detection and Reporting
- Buy-Now-Pay-Later (BNPL): Is a Credit License Required?
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.