Labour and Employment

Renewing Work Permits: How Far in Advance?

Flat Lay Photography of Unfold Book Beside Macbook.

Work permit renewal has a hard filing window: file too early and the application is not yet eligible; file too late and the renewal right is lost entirely, forcing a fresh issuance from scratch. Many enterprises lose the renewal right not for missing documents but because the expiry-tracking calendar drifted. This article sets out the filing window, conditions and renewal count under Article 29 of the current Decree 219/2025/ND-CP, and what to do once the window has been missed.

1. The renewal window: at least 5 days of validity left, no earlier than 45 days before expiry

Article 29 of Decree 219/2025/ND-CP provides that a work permit is renewed when the issued permit still has at least 05 days of validity but no more than 45 days remain until its expiry date. In calendar terms: if a permit expires on 30 June, the renewal file may only be lodged between mid-May (45 days before) and 25 June (5 days before expiry). Filed before the 45-day mark, the application fails the timing condition; filed when fewer than 5 days remain or after expiry, the enterprise loses the renewal right. The accompanying conditions are that the permit’s original elements are unchanged: the same employer, the same job position, and the worker still meeting that position’s conditions. A work permit is issued for the term requested by the employer up to a maximum of 02 years, and renewal is likewise capped at 02 years — so a 2-year permit renewed for a further 2 years is the most common pattern.

2. What the renewal file contains

The renewal file is lighter than a fresh-issuance file because the continuity of the employment relationship is already on record, but it still contains core documents: the employer’s written renewal request on the prescribed form; the original issued work permit still in validity; a health certificate still valid as prescribed; the worker’s valid passport; and documents proving the worker continues in the permitted position (a labour contract or assignment document in force). Before filing, check the synchronisation of all dates: the passport must not expire within the requested renewal period; the labour contract must cover the renewal term; the health certificate must have been issued within the statutory period counted to the filing date. Desynchronisation at any point is a reason for a supplementation request, and slow supplementation can push the file out of the 5–45-day window.

3. How many renewals, and what comes after

Under Article 29 of Decree 219/2025/ND-CP, a work permit may be renewed only once, for a maximum of 02 years. When the renewal period also ends, the next path is not a second renewal but a fresh issuance under the full Article 22 process, if the enterprise still has the demand and the worker still meets the position conditions. The important management consequence: the maximum life of one renewal chain is the initial term plus one renewal; an enterprise with a long-term expert in Vietnam must plan ahead for the switch to a fresh-issuance file, with the full demand-reporting and document-legalisation steps as at the first time. The renewal date should also sit on the same calendar as the residence card renewal, because a labour-category residence card is issued by reference to the work permit term — only once the permit is renewed does the card have a basis for corresponding renewal.

4. Forgetting to renew: the right is lost, and here is the remedy

Once the renewal window has closed — fewer than 5 days left, or the permit already expired — there is no renewal procedure left to rescue the file. If the permit has expired and the worker keeps working, that is work without a valid permit, with the penalty exposure analysed in the expired-permit article in this section. The only lawful route is a fresh issuance under Article 22 of Decree 219/2025, and the worker must stop working during the gap until the new permit is issued. On the employment side, permit expiry also pulls consequences for the labour contract — the contract may have to terminate or be suspended depending on the situation, a subject analysed separately in article FDI-LC-1456 on this site on contract termination when an expert’s permit expires. Prevention remains the cheapest solution: set a reminder at 60 days before expiry so the renewal file is ready on the first day of the window.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.