Real Estate and Construction

Sub-Leasing Part of the Workshop: Need the Landlord’s Consent?

Two workers in a warehouse — illustrating sub-leasing part of a workshop

Leasing a workshop is not sub-leasing land

This is the most confused point. When you lease out part of a workshop (not the land use right), the law treats it as leasing assets attached to the land — and Point dd, Clause 1, Article 34 of the 2024 Land Law entitles annually-paying tenants to do this, together with the leasehold interest under the land lease contract.

In other words: you do not need to be the park’s infrastructure developer to lease out your own workshop. But “permitted by statute” and “permitted by contract” are two different things.

Why the landowner’s consent still matters

The head land lease/sub-lease between you and the infrastructure developer (or the State) almost always contains a sub-letting clause: either prohibiting it or requiring prior written consent. The developer’s practical reasons: controlling the sub-tenant’s industry (keeping polluting or hazardous trades out), security, fire safety, and shared infrastructure capacity.

If you lease out without required consent, the lessor may treat it as breach — from contractual penalties up to unilateral termination of your head lease, leaving you liable to compensate your own sub-tenant for failure to deliver the premises.

The correct procedure: four steps

1. Re-read the head contract — pin down the sub-letting clause: is consent needed, on what conditions, with what response time.

2. Seek written consent — send an official letter with the prospective sub-tenant’s profile: industry, headcount, utilities demand, environmental assessment. Seek it before signing the sub-lease, not after.

3. Sign the sub-lease — specify area, location within the workshop, term not exceeding your remaining head-lease term, fire-safety and environmental duties, and termination if the head contract ends.

4. Notify/report — per park rules, inform the park management board of the new sub-tenant for labor, security and order management.

Frequently asked questions

Is leasing the whole workshop different from leasing part of it?

Legally the same nature (leasing attached assets). The difference: leasing the whole means you no longer use the site — consider your IRC duty to maintain project operations.

Must the sub-tenant register anything?

A sub-tenant producing or trading at the site needs appropriate business/investment registration there; its tax, labor and environmental duties are independent of yours.

The KCN developer refuses without reasons — what now?

Check whether the contract allows arbitrary refusal. If it merely requires “consent” without a right to unreasonably withhold it, a groundless refusal may breach duties of cooperation/good faith — renegotiate or ask the park management board to mediate.

Is the sub-lease price controlled?

The law does not control private asset sub-lease pricing; the parties agree. But if you enjoy investment incentives tied to land use, check whether sub-leasing affects incentive conditions.

Must the sub-lease be notarized?

Not required between economic organizations. But put it in a tight written contract with an attached layout of the leased portion and a handover-condition record.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.