Offshore wind is a project whose design life is longer than a policy cycle, whose capital is counted in billions of dollars and whose revenue comes from a single buyer, the national power system. In such a structure the tax incentive is the easiest part of the equation to compute; the part that decides whether the project lives or dies is the power price and the policy risks sitting outside tax law.
Tax incentives inside the renewables frame: the most certain part of the project
An offshore wind project falls in the renewable energy group enjoying a preferential corporate income tax rate of 10 percent for 15 years under Article 12 of the Corporate Income Tax Law 67/2025/QH15, four years of exemption and a 50 percent reduction for the following nine years under Article 13, and sits in the investment incentive sector catalogue of the Investment Law 143/2025/QH15 with attached land and procedure incentives depending on project scale and sea area. For a project whose construction phase runs for years and whose revenue starts only at commercial operation, the holiday rhythm counted from the first taxable income year places most of the payback period in a very low effective rate zone.
Import duty is the second cash incentive: turbines, towers, foundations and export cables are equipment not yet producible domestically, imported to form fixed assets of an incentivised project and therefore exempt from import duty under Article 16 of the Law on Export and Import Duties 107/2016/QH13. On a project where the equipment package takes most of the total investment, this exemption is very large in absolute terms, and it carries the duty to administer the exempt equipment list throughout construction and early operation.
The price of power sold to EVN: no long-term fixed price commitment remains
The question investors ask most is also the one needing the most careful answer: Vietnam no longer runs a long-term fixed FIT price mechanism for new wind projects of the kind earlier-phase projects enjoyed. The price of power sold to EVN is now set within a price frame issued by the Ministry of Industry and Trade period by period and negotiated in the power purchase agreement under the Electricity Law 61/2024/QH15, which means the twenty-year revenue line of the project is anchored to a frame that can change between cycles and to project-by-project negotiating strength.
The financial consequence is that the tax incentive scenario may not stand alone in the investment model: the same tax incentives with a different power price band produce two entirely different projects in debt service capacity. Lenders therefore appraise offshore wind on a cautious price scenario, stress test delays to commercial operation, and require risk-sharing mechanics in the power purchase agreement on committed output and curtailment conditions.
Policy risks outside tax law: planning, sea area and the grid
The three largest policy risks of offshore wind appear in no tax document. First is planning: the project must sit inside the national power development plan and the capacity allocation list of each phase; a location outside the plan cannot be saved by any incentive. Second is the sea area: allocating a sea area for survey and then construction under the marine resources legal frame is a long procedure chain tied to national defence and overlapping with navigation and fisheries. Third is grid connection: the connection point and transmission line schedule decide the commercial operation date, and a late connection means capital spent while revenue has not started.
The right governance is to place these risks on the same map as the tax scenario from the pre-feasibility stage: confirm the planning position before spending heavily on surveys, run the sea area procedure in parallel with technical design, and lock connection milestones in the agreement with the transmission unit. The 10 percent rate for 15 years is real and valuable, but it only multiplies a project that has already passed the three gates of planning, sea and grid.
Frequently Asked Questions
What incentives are available for offshore wind power investment?
The core tax incentive is corporate income tax of 10 percent for 15 years under Article 12 of the Corporate Income Tax Law 67/2025/QH15, four years of exemption and a 50 percent reduction for the following nine years under Article 13; the sector also sits in the investment incentive catalogue of the Investment Law 143/2025/QH15. Add import duty exemption for fixed-asset equipment not yet producible domestically. Land and procedure incentives follow project scale and area, while power price support is not part of the tax incentive package.
Is import tax on equipment exempted?
Yes. Turbines, towers, foundations and subsea cables are equipment not yet producible domestically, imported to form fixed assets of a catalogued incentive project and exempt from import duty under Article 16 of the Law on Export and Import Duties 107/2016/QH13. This is a large cash incentive during construction because the equipment package takes most of the total investment, and the company must administer the exempt equipment list through construction and early operation to avoid recovery if use purposes change.
Is there a commitment on the electricity price sold to EVN?
There is no longer a long-term fixed FIT-style price commitment for new projects. The price of power sold to EVN is determined within a price frame issued by the Ministry of Industry and Trade period by period and negotiated in the power purchase agreement under the Electricity Law 61/2024/QH15. The financial model must therefore be built on a cautious price scenario, stress tested for commercial operation delays, with risk-sharing on output and curtailment negotiated into the power purchase agreement, instead of assuming one fixed price for twenty years.
What are the main policy risks?
The three largest risks sit outside tax law: the project must be inside the power development plan and receive a capacity allocation by phase; the sea area allocation procedure for survey and construction is long and touches defence, navigation and fisheries; and the grid connection schedule decides the revenue start date. The periodic change of the power price frame is an additional structural revenue risk. Govern by confirming the planning position before heavy survey spending, running the sea procedure in parallel with design and locking connection milestones early.
Related articles
- VAT Refunds for Businesses With High Export Revenue for Over Five Consecutive Years: Fast-Track Refund Conditions
- Non-Creditable and Non-Refundable Input VAT That Must Be Expensed: Identifying Correctly to Avoid CIT Risks
- VAT for Domestic Digital Platform Businesses: Vietnamese Digital Service Enterprises Invoicing Global Customers
- Input VAT Credit for Goods Imported Through Third Parties and Entrusted Import: Tax Payment Proof by Representatives
- VAT on Real Estate Transfers: Taxable Price and Deductible Land-Use Levies Under the New Rules
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.