Which wastewater standard a factory in an industrial park must meet sounds like a simple question, yet it is the most persistently confusing point in environmental compliance, because the answer depends on where the factory’s wastewater flows: into the park’s centralised treatment system or straight to a receiving source. The two routes lead to entirely different limit sets, and choosing the wrong route in the environmental permit file forces the whole treatment system design to be redone.

Connecting to the park’s centralised system

Most factories in an industrial park connect their wastewater to the park’s collection and centralised treatment system. In this model, the factory’s wastewater must meet the reception limits of the centralised system under the park’s rules and the connection contract, before the infrastructure investor treats it further down to the environmental discharge limits. Reception limits are usually built on the national technical regulation on industrial wastewater QCVN 40:2011/BTNMT with each park’s own application coefficients.

Final output responsibility to the receiving source then sits with the park infrastructure investor under the park’s environmental permit, but the factory is not thereby free of duty: discharging beyond connection limits that overloads or damages the centralised system breaches the connection contract and can still draw environmental sanctions, and the factory must pre-treat characteristic streams such as plating, dyeing or hard-to-degrade chemical wastewater.

Discharging directly to a receiving source and the environmental permit

Where a factory discharges directly to a receiving water source, for example a plant outside the centralised system or with its own outfall, treated wastewater must meet the national technical regulation on industrial wastewater QCVN 40:2011/BTNMT: column A for water sources used for domestic water supply, column B for other sources, calculated with the flow and receiving-source coefficients in the regulation. Separately handled domestic wastewater follows the domestic wastewater regulation QCVN 14:2008/BTNMT accordingly.

The factory’s environmental permit is the document locking these parameters: discharge point, maximum flow, pollutant list and each substance’s limit value are recorded in the permit, and the factory’s monitoring results are compared directly against the permit at inspection. Some large-scale subjects must also install automatic continuous wastewater monitoring systems transmitting data to the environmental authority under Decree 08/2022/ND-CP.

Compliance risks and how to control them

The most common violation by park factories is not the absence of a treatment system but its operation: treatment chemicals cut at night, characteristic streams connected without pre-treatment, or influent parameters swinging with production seasons beyond design. When an incident occurs, responsibility is traced along the chain: the factory answers for wastewater quality at its own connection point, the infrastructure investor answers for quality at the park’s final outfall.

The durable control method is to manage by permit and contract: a discharge file comprising the environmental permit, the connection contract, pre-treatment acceptance records and periodic monitoring results kept and reviewed together. When the factory changes capacity or adds a line generating a new waste stream, that is the signal to reassess both connection limits and environmental permit content before the change happens in reality.

Frequently Asked Questions

What permit does an FDI enterprise need to discharge wastewater into a water source?

An FDI enterprise discharging wastewater into a water source must hold an environmental permit under Law on Environmental Protection 72/2020/QH14, in which wastewater discharge is one component: the permit records the discharge point, maximum flow and each pollutant’s limit. The former stand-alone wastewater discharge permit under water resources law has been integrated into the environmental permit, so the enterprise does not apply for two permits for the same discharge; where discharge goes into an industrial park’s centralised system, the main duty is meeting reception limits under the connection contract.

What are the wastewater standards?

Column A of QCVN 40:2011/BTNMT applies where the receiving water source is used for domestic water supply purposes, with tighter pollutant limits; column B applies to sources not used for domestic supply. Which column applies is determined by the planning and function of the receiving source at the discharge point, and is recorded in the environmental permit of the factory or of the industrial park depending on the discharge model.

Where is the discharge permit applied for?

Application is made to the authority competent to issue the project’s environmental permit: the Ministry of Natural Resources and Environment for projects in the ministerial list, the provincial people’s committee for most factories in industrial parks. The dossier is filed through that authority’s single-window mechanism; for a park factory, the park management board is the guidance focal point confirming reception infrastructure. Discharge content is appraised within the same environmental permit appraisal, not as a separate procedure.

What are the penalties for exceeding discharge standards?

Discharging wastewater beyond the regulation or beyond limit values in the environmental permit draws administrative fines under the environmental penalty decree, scaled to exceedance level and discharge flow, with remediation measures and possible suspension of discharge activity. Discharge causing serious pollution or release of untreated toxic substances can lead to criminal liability for the environmental pollution offence. Monitoring results and automatic monitoring data are the main evidence in such cases.

Bottom line for park factories

Identifying correctly where a factory’s wastewater flows is the step that settles the standards question: centralised connection follows the park’s reception limits, direct discharge follows QCVN 40 with the column matching the water source’s function. Both routes are locked in the environmental permit and the connection contract, the two documents a factory’s environmental team must know by heart.