Labour and Employment

Work Permits Issued in Newly Merged Provinces: File Transitions When the Licensing Authority’s Boundaries Change

Two professionals engaging in a business meeting, signing documents for a consulting agreement.

From 1 July 2025, Vietnam operates with 34 provinces and cities after the provincial-level administrative unit rearrangement. For an FDI enterprise, the new administrative map is not merely a change of address on paper: the work permit authority has changed both name and territory — from the old province’s Department of Labour, Invalids and Social Affairs to the new province’s Department of Home Affairs — and filing with the wrong focal point during the transition is the most common cause of delay in foreign personnel files.

The new authority: the merged province’s Department of Home Affairs

Under the new organisational structure, foreign labour management functions moved to the Department of Home Affairs in each locality. That means the whole procedural chain of Decree 219/2025/ND-CP — approval of the need to employ foreign labour, issuance, reissuance and extension of work permits, confirmation of permit-exempt status and receipt of notifications for the under-90-day category — is filed with the Department of Home Affairs of the new province where the enterprise is based or the person works. An enterprise with a plant in a merged province must update every administrative data point tied to the province’s name: form templates bearing the old locality name, seals and digital signatures registered under the old address, public service accounts attached to the dissolved administrative unit. On the public service portal, a file submitted to a dissolved unit will be returned or left hanging without a clear status — checking the receiving unit’s name on the system before filing is the cheapest step to avoid losing two weeks.

Issued permits and pending files: the succession principle

The enterprise does not start over. A work permit issued by the old province’s authority and still within its term remains valid until the expiry printed on it; at extension or reissuance, the file goes to the new province’s Department of Home Affairs under the post-merger territory. Files in progress at the merger date are handed over to the corresponding authority of the new province for continued processing, preserving the sequence and results of completed steps — the enterprise need not refile from scratch, but should proactively contact the new receiving authority to confirm its file was handed over and obtain the responsible officer’s contact, because handovers of paper files among merging units have in practice seen localised loss and delay. The enterprise should also review internal documents referencing the old territory: the foreign labour need approval decision, labour contracts stating the work location, and the employee’s temporary residence registration — when a new legal event arises such as extension, position change or site relocation, the whole document chain must be synchronised to the new locality and authority in one pass.

A transition checklist for the HR function

Five tasks for the transition quarter. First, list every foreign employee with a valid permit by site, attaching each file to the new province and its receiving Department of Home Affairs. Second, cross-check each permit’s expiry against the extension calendar, because a work permit under Decree 219/2025/ND-CP runs a maximum of two years and extends only once — any file falling exactly in the merger window needs extra processing slack. Third, update the new locality name across contracts, decisions and residence registration files whenever a change event occurs. Fourth, verify the online public service account and the receiving unit directory before each filing. Fifth, archive the handover record or the new authority’s confirmation for files in progress — this is the evidence protecting the enterprise if the filing date or responsibility for a delay is later disputed.

Frequently Asked Questions

Must a work permit issued in the former province after a merger be re-issued, or is only the information adjusted?

Yes. A work permit issued by the old province’s authority and still within term remains fully valid until the expiry printed on it; the enterprise does not reapply merely because of the merger. When extension or reissuance falls due, the new file goes to the post-merger province’s Department of Home Affairs. Note the Decree 219/2025/ND-CP frame limits still apply: a maximum of two years and only one extension, so longer staffing plans must contemplate a fresh issuance after the single extension is used.

By what mechanism do work permit dossiers in process at the former province’s authority transfer to the new province’s authority?

No refiling from scratch is required. A file in progress is handed over by the old province’s authority to the corresponding authority of the new province for continued processing, preserving the results of completed steps. The enterprise should nevertheless proactively confirm in writing or through the public service system that the file was handed over, obtain the new responsible officer’s contact, and archive that evidence — handovers among merging units have in practice seen localised delays, and proactive confirmation is the only way the enterprise proves it was not the party causing a missed deadline.

If the workplace stated on the work permit changes name due to the merger while the actual place is unchanged, must an amendment be sought?

The documents referencing territory and the licensing authority include: the foreign labour need approval file, labour contracts stating a work location in the old province, the employee’s temporary residence registration, form templates and the address on the public service portal. Not every valid document must be amended at once, but at the next legal event of each file — extension, reissuance, position change, site relocation — the whole chain must be synchronised to the new locality name, avoiding a dossier carrying two different province names when inspectors cross-check.

What must the enterprise notify foreign employees when the licensing authority changes?

The notification should go out as one short written package as soon as the merger takes effect for the enterprise’s locality, covering four points. One, the procedural contact point has changed: the Department of Home Affairs of the post-merger province or city is the authority receiving and processing foreign labour procedures under Decree 219/2025/ND-CP, inheriting the former province authority’s functions — with the new address and filing channel so employees do not file to a dissolved office. Two, an existing work permit remains valid until the expiry date printed on it and need not be redone merely because the province was renamed. Three, each individual’s renewal and re-issuance milestones are unchanged, but dossiers arising after the merger will bear the new locality and authority names. Four, personal documents tied to the locality — temporary residence registration, workplace information in the contract — will be synchronised to the new names at the next legal event, and the enterprise should name one HR contact for questions so experts do not process matters through the wrong channel themselves.

Synchronise foreign labour files after the merger with FLAT Law Firm

FLAT Law Firm audits the enterprise’s entire work permit portfolio against the 34-province map, confirms the handover status of pending files with the new province’s Department of Home Affairs and builds the extension calendar under Decree 219/2025/ND-CP so no file misses a deadline because of administrative change.

Related articles

Reviewed by the Legal Practice Group – FLAT LAW FIRM

This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.