Foreign Investment

EUDR: Leather Is OUT of Scope — Paper and Timber Businesses Must Re-Read the New Timetable

Pexels 17315570

The direct answer: the scope of the EU Deforestation Regulation (EUDR — (EU) 2023/1115) changed significantly in 2026. The European Commission adopted Delegated Regulation (EU) 2026/2102 (in force from 18 September 2026), formally removing cattle hides, skins and leather, retreaded tyres, rubber transmission belts and sowing soybeans from Annex I — meaning Vietnamese leather exporters to the EU are no longer in EUDR scope. Paper and pulp (chapters 47/48, except bamboo and recycled paper), by contrast, STAY in scope. At the same time, Regulation (EU) 2025/2650 pushed back the general application dates: 30 December 2026 (medium and large companies) and 30 June 2027 (micro and small companies). Vietnamese businesses must re-read their entire compliance plan under the new framework — much existing guidance (including from this very campaign) is already outdated.

Leather out of scope: what (EU) 2026/2102 changes in detail

The delegated act (EU) 2026/2102, adopted 13 July 2026 and in force from 18 September 2026, amends Annex I of the EUDR. Removed: cattle hides, skins and leather — big relief for Vietnam’s leather and footwear exporters to the EU; retreaded tyres; rubber transmission or conveyor belts; and soybeans for sowing. Added, in the other direction: instant coffee, frozen bovine tongues, and certain palm-oil derivatives — applying from 30 December 2027. The Commission says leather will be reconsidered in the 2030 EUDR review, so “out of scope” today does not mean a permanent exemption. For leather businesses: stop spending on due-diligence-statement preparation for leather immediately — but keep the traceability system, because EU buyers may still demand it contractually.

Paper and pulp stay in: what paper businesses do with the new timetable

Paper, paperboard and pulp under chapters 47/48 of the Harmonised System (except bamboo and recycled paper) remain in EUDR scope — nothing in the 2026 amendments changes that. The new timetable under (EU) 2025/2650 (adopted by Parliament and Council 19 December 2025, published 23 December 2025, in force 26 December 2025): medium and large companies apply from 30 December 2026; micro and small companies from 30 June 2027. Beyond the postponement, (EU) 2025/2650 also: removes printed products (books, newspapers) from scope; creates a new “downstream operator” category (no due-diligence statement required); and lets micro/small primary operators file a one-off simplified declaration. Vietnamese paper businesses: use the extra time to finalise plot geolocation systems and due-diligence statements — do not read the postponement as “delayed indefinitely”; the Commission has said there will be no further delay.

Warning: much old guidance is outdated — check three points before acting

Point one: the dates. Any document saying “applies from 30/12/2025 / 30/06/2026” is old — the new dates are 30/12/2026 and 30/06/2027. Point two: product scope. Any checklist still listing leather is wrong; any checklist missing instant coffee, frozen bovine tongues and palm-oil derivatives (from 30/12/2027) is incomplete. Point three: downstream-operator obligations. If a business only processes or packs at the end of the chain, it may fall into the new “downstream operator” category and be exempt from the due-diligence statement — but it must correctly identify its position in the chain, not assume. Recommendation: check the full texts of (EU) 2025/2650 and (EU) 2026/2102 on EUR-Lex (English) directly rather than relying on secondary summaries, because summaries written before September 2026 do not reflect this amendment round.

Frequently asked questions

Is leather still under the EUDR?
No. Delegated Regulation (EU) 2026/2102 (in force 18/9/2026) removed cattle hides/skins/leather from EUDR Annex I. Leather will be reconsidered in the 2030 review, so this is not yet a permanent exemption.
What about paper and pulp?
Still in scope (chapters 47/48, except bamboo and recycled paper). The 2026 amendments change nothing for this group.
What is the current EUDR application timetable?
Under (EU) 2025/2650: 30/12/2026 for medium and large companies; 30/06/2027 for micro and small companies. The Commission says there will be no further postponement.
What is a “downstream operator”?
A new category created by (EU) 2025/2650: operators at the downstream end of the chain are not required to submit a due-diligence statement. Businesses must correctly identify their chain position before relying on it.