Scenario: a Singaporean 3PL renting a warehouse in Ho Chi Minh City faces rising inner-city rents and restricted container-truck hours. It wants a new 3-hectare distribution center at the city’s southern gateway, and Long Hau Industrial Park (Long An) is a strong candidate — bordering Ho Chi Minh City, near Hiep Phuoc port and National Route 50. For logistics, the legal math differs from manufacturing: land-use purpose, warehouse floor loading and warehouse fire safety decide the deal.
Long Hau: the logistics gateway south of Ho Chi Minh City
Long Hau Industrial Park in Long An borders Nha Be district of Ho Chi Minh City — trucks and containers reach the city center and southern parks without pushing deep into the inner city. National Route 50 connects to the Mekong Delta; Hiep Phuoc port and the region’s river-port system open a waterway option for bulk cargo. For a distribution center serving Ho Chi Minh City, every kilometer saved converts directly into daily operating cost.
Technical infrastructure needs a logistics lens: soil conditions and allowable loading for high-bay or cold-storage warehouses; clear height and structural capacity; backup power for cold storage; internal roads wide enough for 40-foot container U-turns and truck waiting yards. Soils here are weaker than average — ground treatment and piling can be a material line in total investment.
Subleasing land for logistics warehousing: the legal frame
Investors sign a land-use-right sublease with the park infrastructure developer under Decree 35/2022/ND-CP. Land Law 31/2024/QH15 (effective 1 August 2024) sets the land term in line with the investment project: up to 50 years, up to 70 years for large-scale projects. Land rent is paid lump-sum or annually.
The logistics-specific legal point is land-use purpose: warehouses, distribution centers and container yards must fit the park’s detailed planning and the business lines in the investment certificate. Bonded warehouses, ICDs or food cold-storage need additional sector permits — and the sublease should state how far the developer’s procedural support goes.
2026 rents: ask components and warehouse terms, not a headline price
No official “2026 rent” exists for Long Hau. Sublease prices are announced by the infrastructure developer from time to time by plot position (near the gate or main roads convenient for container access, prices differ). The correct process: send a formal written quote request demanding four separated components — land rent; infrastructure usage fee (per sqm per year plus escalation); management service fees; connection charges — and benchmark against at least two other parks or logistics zones in Long An and Ho Chi Minh City.
The comparison must add: weak-soil treatment; warehouse fire protection (sprinklers, compartmentation by goods classification); substation and backup power; truck in-out management and overnight container parking fees. Miss these and a cheap headline rent becomes an expensive total cost.
Five sublease traps for logistics projects
1. Land-use purpose and registered lines. The sublease and investment certificate must record warehousing, logistics and distribution. Adding a bonded warehouse, cold storage or third-party subleasing later requires checking permission clauses — never build first and permit later.
2. Warehouse fire safety follows the goods. Warehouses holding flammables (chemicals, batteries, packaging) face higher fire standards; sprinklers, compartmentation and escape routes need appraisal and acceptance before goods move in. Budget fire-system costs from day one.
3. Floor loading and structure. If the contract or park rules cap height or loading, future high-bay or automated warehouses may hit a wall. Clarify permitted technical parameters upfront.
4. Container-truck access. Some parks restrict heavy-truck hours and internal routes. A 24/7 distribution center needs written confirmation of time windows and container-truck routes.
5. Fee escalation and warehouse subleasing. Negotiate periodic caps on infrastructure-fee increases; clarify the right to sublease part of the warehouse to clients (the 3PL model) — many land subleases prohibit or restrict this.
Checklist before signing in Long Hau
- Confirm land-use purpose and logistics/warehousing lines in the investment certificate and sublease.
- Survey geology; put ground-treatment costs into total investment; check allowable loading and height.
- Obtain a written four-component quote; add fire protection, backup power and ground treatment.
- Design fire systems to the planned goods classification; put acceptance into the schedule.
- Confirm 24/7 container-truck windows and routes in writing; review third-party sublease rights.
Frequently asked questions
1. Can industrial-park land host logistics warehouses?
Yes, if consistent with the park’s detailed planning and registered business lines; the key is recording the correct purpose in investment dossiers and the sublease.
2. What is the 2026 land rent in Long Hau?
There is no official price for Long Hau. The developer announces prices from time to time by plot position. Send a formal written request for an itemized official quote.
3. What extra procedures apply to a bonded warehouse?
Beyond standard investment, land and construction procedures, a bonded warehouse must meet customs-law conditions and gain customs recognition; prepare the sector dossier in parallel.
4. Can we sublease warehouse space to other clients?
It depends on the land sublease with the park developer. Many subleases restrict or require prior approval for subleasing built assets; clarify upfront if the business model is 3PL.
5. How do weak soils in Long An affect cost?
Soils here are weaker than average, so piling and ground treatment for heavy-load warehouses can be significant. A geotechnical survey is mandatory before finalizing total investment and rent talks.
Related articles
- 50-Year Land Lease Renewal Denied over Slow Progress: Saving the Project
- Land Use Fee Clawed Back for Unauthorized Purpose Change: Fix
- Land Rent Recalculated 3x Under New Price Table: Appeal Playbook
- Commentary on the Land Law 2024: Key Chapters for Foreign-Invested Projects
- Land Disputes: Court vs Administrative Resolution
This legal analysis has been verified against current Vietnamese regulations and cross-border FDI transaction practices by the attorneys at FLAT LAW FIRM.

